WA State School for the Blind Vancouver, WA

General Contractor: Corp Inc Construction 

Project Size: Demolition of Kennedy Gymnasium and new construction of Kennedy Fitness Center

JRT Contract: $1,000,000

JRT Foreman: Gary Ritola

Job Notes: Design for the Kennedy Fitness Center included “Green” heating technology. The salt water in the Olympic-sized pool is heated by means of closed loop boilers, through heat exchangers. The thermal pool water is then circulated back to the mechanical room, through another heat exchanger to allow the closed loop system to exchange energy which supplies the heating and cooling for the front office and adjacent classrooms. Our installation of this highly efficient design can be viewed on the bottom photograph of this page.